After all my belongings were removed from my house and placed in storage, I came back from Ashland (where I had enjoyed seeing Julius Caesar, Henry IV Parts 1 & 2, The Merry Wives of Windsor, and Beauty and the Beast) and moved into a hotel in Bellingham. An "extended stay" hotel.
My homeowner's insurance booked the place. My dog and I moved in on Labor Day, and we were there until shortly before Christmas. It was a nice enough place, but it's a weird feeling to live in a hotel. It's a kind of limbo. It's not home. I made my own meals, using the microwave and stove top in my room. There was no conventional oven.
One nice thing was that because the hotel was in Bellingham, where I also work, I could drive there for lunch. It took about 15 minutes each way, so I had about half an hour to spend in my own space.
Sometime in December, my dog's special dispensation to come to work with me expired. The first estimate I received, back in August, for how long it would take to fix my house was "probably three months." Well, three months was up, and I needed to find a new place for him to be while I worked.
I enrolled him in the doggy daycare program at Hyline Hotel for Dogs. That's where I boarded him when I went on vacation. They play with the dogs and give them attention, so he's been pretty happy there. He goes in willingly with his tail wagging, unlike at the vet's where (although they are very kind people there) his tail drops, he trembles, and he tries to hide behind me.
At one point, I became depressed about living in a hotel, so the dog and I spent a weekend with my sister-in-law. Then, at Thanksgiving, we spent that whole 4-day weekend with her again.
Close to Christmas, my dog became ill. He was droopy and sad at all times and had no appetite. So I had to take him to the kind vet's office, where it turned out he had elevated counts of liver enzymes and white blood cells. So I came away with an antibiotic and a liver pill (Denamarin).
Also close to Christmas my insurance company felt they had paid for my lodging quite long enough. They had approved three months, then added one more, but that was it. They decided the reason for the delay was the choices I made for having tile installed instead of just replacing the laminate and carpet that I previously had. They were probably right. Anyway, I was on my own for lodging. Once again, my sister-in-law to the rescue. I moved into her house just before Christmas, and here I still am.
So what has been happening with my house? you may ask. Well, workers came in and installed new drywall.* This involves multiple stages, putting there, taping it, "mudding" it. I really don't know anything about the process. I'm just trying to drag out the description to match how long it took to get done.
Then painters came in and painted all the walls and ceilings in the place. I told them to match the wall color as much as possible to the old one and do the ceiling the same color but a few shades lighter. I have read that a lighter ceiling looks higher. My ceilings are low. Some of my taller relatives can touch the ceiling just standing on the floor. I come from a tall family, although I am not among the tallest.
This winter we had tons and tons of rain, and after the dry-walling and painting were complete, In December, I received an email from the contractor that water was seeping in through the north wall. Have I explained that I live in a daylight basement? The front of the house faces north, and on that side the upstairs front door is at ground level. The ground slopes down to the back yard, and on the south wall my downstairs entry door is at ground level. So the north wall of my place is part of the foundation, and behind the drywall is cement.
The contractor believed the water was seeping in because of all the rain we'd had. They needed to open up some of the just-installed drywall to find the leak. It turned out to be coming in through a "snap-tie" hole. That was a hole left over from when the cement was poured into the mold when the house was built. Snap-ties held the mold in place and when the cement was set then the mold and presumably the snap-ties were removed. This hole was a ways up the wall and probably leaked this year because of the exceptional amount of rain we had, so that the ground water went up that high.
The Pacific Northwest is famed for being rainy, so when you have exceptional amounts of rain, you know it's a lot.
Well, what with the holidays and all, it was mid-January before the hole was sealed up and the drywall replaced and repainted. Meanwhile, I had picked out the floor tile and also a wood flooring for the stairs to the upstairs unit.
The floor guys had to do some leveling before laying the tile. The southwest corner of my house has sunk a bit in the 35-plus years since the house was built, and the floor tilts visibly in that direction. But they got it prepped and they laid the tile. Just this past Friday I met them there to choose a grout color. I think they were grouting this weekend. Then, workers will put my bathroom fixtures back in place, including a new "vanity." And they'll put in the baseboards and door trim. And they'll clean up the drywall dust.
I've recently been told my place will be ready for my stuff to come back in by Thursday of this week! I'm going to confirm that Monday or Tuesday. (Monday is Presidents Day; I'm not sure if the contractor's office will be open.) I did tell the mover guys that date already. I want to make sure it's still good. I mean, I was told three months back in August, then mid-December, then mid-January, then early February. So I have a slight trust issue about completion dates.
I will say, however, that the new paint and the tiles, even without grout, look great. I am SO looking forward to moving back in.
* Another word for "drywall" is "sheetrock." My uncle, my dad's oldest brother, was a contractor, and he once told my dad that all sheetrockers are crazy. My uncle was given to sweeping statements.